Maesmawr Solar Farm

Project Overview

The proposed Maesmawr Solar Farm will produce clean renewable energy contributing to local and national energy targets with additional benefits to include:

• Biodiversity net gain for the area over the lifetime of the project
• Dual use of land with clean energy production and sheep farming

Key Project Details

  • Location: Maesmawr Farm, Upper Boat, Ton-Teg, Rhondda Cynon Taf, Wales, CF38 1SL.
  • Project size: Up to 26 MW of solar capacity.
  • Site area: 92 acres
  • Construction duration: ~ 12-16 weeks
  • Grazing: Sheep will graze the site once operational

Project Booklet


To learn more about the proposed solar PV farm at Maesmawr Solar Farm, please download the project information leaflet.